ABOUT

Godber & Co. - Square icon (grey) cropped

img688

Exeter Road

10 03 19 1st floor Mx 1.4G+1.6Q

GreenLight2

Johnny%20Hook%20Stringing1

Dyne Road

Dukes Head Yard - additional storey

SK01 KSA Studio - Supporting steelwork & foundations

Shear Link (grey)

img005

Spencer Park

img230

P1010625

Wetwind construction sequence

DownloadedFile-4

img576

Engineers vice

img505

City_Interiors-Victoria_image_21_of_67

img288

2013-08-30_09-32-49_179

Invite 2013

Invite v.2

Img_3582

Concern-ChrisDeBode-9

Img_1250

Img_1146

The Pines

img013

Godber & Co. are structural engineers specialising in the design, fabrication, and installation of artworks.

We have experience of working at a range of scales, and in a variety of materials: from furniture and exhibition stands, to major structural alterations and construction of new and existing buildings.

We work for individuals, organisations, and institutions – both public and private.

We work alongside and collaborate with fellow structural engineers and architects; artists, makers, builders, project managers, building services engineers, Party Wall surveyors, cost consultants and other professionals.

We are not currently taking-on new projects.

Godber & Co. is a private limited company registered in England & Wales No. 07097183.

The company was set-up by Ben Godber in 2010.

Ben studied architecture at the Bartlett, UCL and practised in architecture before qualifying as an engineer. He has more than twenty years’ design experience and has returned to teach structural design and construction technology at the Royal College of Art, the Bartlett, the Architectural Association, Imperial College, the University of Kent, and Kingston University.

Ben is currently training as a secondary school physics teacher.

To see a copy of Ben’s CV click here.

Leave a Reply